banner

fencing_frame

TABLE OF CONTENTS

 

(8) REMOVE ANGLE SLOT AND MARK THE CENTER OF EACH HOLE AND DRILL STARTER HOLES WIdrill holesTH 7/64TH INCH DRILL BIT COMPLETELY THROUGH PLYWOOD, THEN REPEAT WITH 7/16TH INCH PADDLE DRILL BIT. TURN PLYWOOD OVER AND TAMP INTO DRILLED HOLES, 7/16TH X 3/8TH INCH T-NUTS UNTIL T-NUTS ARE FLUSH WITH BOTTOM SURFACE OF PLYWOOD.
REPEAT THIS PROCEDURE WITH ANGLE SLOT ALONG LEFT SIDE LINE, BUT NOW USE POINT C AS YOUR REFERENCE POINT.
NOTE: NOW THERE ARE FOUR 7/16TH INCH HOLES DRILLED IN THE PLYWOOD WITH FOUR 7/16TH X 3/8 INCH T-NUTS TAMPED IN PLACE, FLUSH WITH THE UNDERSIDE SURFACE OF THE PLYWOOD.
YOU HAVE NOW COMPLETED THE FRONT HALF OF A FOUR POINT TIE-DOWN SYSTEM FOR BOTH PLATFORMS “A” & “B.”

 

< PAGE 5 >